14245 Highway 50

The Town has received a proposed Official Plan Amendment and Zoning By-law Amendment (Re-Zoning) applications.

 Current Status
  •  In Circulation

Property Description

The subject lands are located at 14245 Highway 50, Bolton, East Side of Highway 50, north of Columbia Way.

  • Town File Number(s): POPA 2022-0002 and RZ 2022-0001
  • Project Name: Glen Schnarr and Associates Inc. on behalf of Columbia Square Inc. (Wyndcliffe Development Inc.)
 Location - 14245 Highway 50, Ward 4
 Location Map
 Official Plan Amendment

The Official Plan Amendment proposes to re-designate the lands from “Bolton North Hill Commercial Area” to a new “Bolton North Hill Mixed Use Area” with site-specific policies allowing for townhouse dwellings, and apartment building dwelling units with commercial uses at grade.

Zoning By-law Amendment

The Zoning By-law Amendment proposes to amend the zoning from General Commercial Exception 577 (C-577) to a site-specific Mixed Density Residential Exception XX (RMD-XX) zone to allow a range of residential and commercial uses with site-specific zone standards.

Updates and notices

Notices 
 Material Submitted
  • Cover Letter
  • Commercial Impact Study
  • SD002 – Phase 1-3 Combined Site Plan
  • SD002a – Phase 1A Site Plan
  • SD500 – Phase 1A Elevations
  • SD002b – Phase 1B Site Plan
  • SD500 – Phase 1B Typical West Elevation
  • SD501 – Phase 1B Elevation
  • SD500 – Phase 1B West Elevation
  • SD501 – Phase 1B Elevation
  • SD100 – Phase 1B P1 Parking Garage
  • SD101 – Phase 1B Ground Floor Plan
  • SD102 – Phase 1B Second Floor Plan
  • SD103 – Phase 1B Third Floor Plan
  • SD104 – Phase 1B Mechanical Penthouse
  • SD002 – Phase 2 Site Plan
  • SD100 – Phase 2 P1 Parking Plan
  • SD101 – Phase 2 Ground Floor Plan
  • SD102 – Phase 2 Level 2 Floor Plan
  • SD103 – Phase 2 Level 3 Floor Plan
  • SD104 – Phase 2 Level 4-6 Floor Plan
  • SD105 – Phase 2 Level 7-8 Floor Plan
  • SD106 – Phase 2 Mechanical Penthouse Plan
  • SD501 – Phase 2 North Elevation
  • SD502 – Phase 2 South Elevation
  • SD503 – Phase 2 East Elevation
  • SD504 – Phase 2 West Elevation
  • SD900 – Phase 2 Isometric Views
  • SD002 – Phase 3 Site Plan
  • SD100 – Phase 3 Site Plan
  • SD101 – Phase 3 P1 Parking Plan
  • SD102 – Phase 3 Ground Floor Plan
  • SD103 – Phase 3 2nd to 6th Floor Plan
  • SD104 – Phase 3 7th and 8th Floor Plan
  • SD105 – Phase 3 Mechanical Penthouse Floor Plan
  • SD106 – Phase 3 Roof Plan
  • SD500– Phase 3 East Elevation – Block A
  • SD501– Phase 3 South Elevation – Block A
  • SD502– Phase 3 West Elevation – Block A
  • SD503– Phase 3 North Elevation – Block A
  • SD002a – Phase 1A Site Plan (Waste Management)
  • SD002b – Phase 1B Site Plan (Waste Management)
  • SD011 – Phase 1B Waste Management Plan (Waste Management)
  • SD002 – Phase 2 Site Plan (Waste Management)
  • SD003 – Phase 2 Waste Management Plan (Waste Management)
  • SD002 – Phase 3 Site Plan (Waste Management)
  • SD003 – Phase 3 Waste Management Plan (Waste Management)
  • Environmental Noise Feasibility Study
  • SD002 – Phase 1-3 Combined Site Plan
  • SD002a – Phase 1A Site Plan
  • SD500 – Phase 1A Elevations
  • SD002b – Phase 1B Site Plan
  • SD500 – Phase 1B Typical West Elevation
  • SD501 – Phase 1B Elevation
  • SD500 – Phase 1B West Elevation
  • SD501 – Phase 1B Elevation
  • SD100 – Phase 1B P1 Parking Garage
  • SD101 – Phase 1B Ground Floor Plan
  • SD102 – Phase 1B Second Floor Plan
  • SD103 – Phase 1B Third Floor Plan
  • SD104 – Phase 1B Mechanical Penthouse
  • SD002 – Phase 2 Site Plan
  • SD100 – Phase 2 P1 Parking Plan
  • SD101 – Phase 2 Ground Floor Plan
  • SD102 – Phase 2 Level 2 Floor Plan
  • SD103 – Phase 2 Level 3 Floor Plan
  • SD104 – Phase 2 Level 4-6 Floor Plan
  • SD105 – Phase 2 Level 7-8 Floor Plan
  • SD106 – Phase 2 Mechanical Penthouse Plan
  • SD501 – Phase 2 North Elevation
  • Functional Servicing Report
  • FS-01 – Functional Servicing Plan
  • FG-01 – Functional Grading Plan
  • Geotechnical Engineering Report
  • Healthy Impact Assessment
  • Small Scale Hydrogeological Assessment
  • Plan of Survey
  • Planning Justification Report
  • Transportation Impact Study
  • Urban Design Brief
  • Waste Management Plans

Contact us, or make an appointment to visit Town Hall to view studies not available online, or previous versions.

Lead Planner

Adam Wendland, MCIP, RPP
Community Planner
Development and Design
905-584-2272 ext. 4024
Adam.wendland@caledon.ca

Additional information

For more information about this matter, or to provide comments, feedback or ask questions, please contact the Lead Planner at 905-584-2272 ext. 4024 from Monday to Friday, 8:30 a.m. to 4:30 p.m.