Road Closures

Search

Select a Date Range
Town Hall Building

Construction Notice - RFT # 2024-140 - Horseshoe Hill Road Equalizer Culvert Construction

Posted on Tuesday, June 24, 2025 09:55 AM

NOTICE OF CONSTRUCTION

RFT 2024-140 - Horseshoe Hill Road - Equalizer Culvert Works

The Town of Caledon is proposing to install a new equalizer culvert located on Horseshoe Hill Road (GPS location: 43.902532, -79.981511) located between Charleston Sideroad and Beech Grove Sideroad. This culvert is being proposed to address known drainage issues on this section of roadway.

A full road closure is required to complete the culvert replacement works. Local traffic will be permitted, however there will...

Notice of Construction - Neighbourhood Youth Cricket Field – Bonnie Glen Farm Park

Posted on Tuesday, June 24, 2025 09:15 AM

Work includes the conversion of the existing baseball diamond to facilitate the construction of a new youth cricket field. Work will include an artificial turf pitch, chain link fencing, and grading and sodding works. The field will be located in the existing Bonnie Glen Farm Park located at 45 Twistleton Street, Caledon.

No road closures are required and the playground, basketball court and other park amenities will remain open. Pathways may be temporarily closed next to the field during active...

Town Hall Building

Construction Notice: RFT 2025 - 063 - Heat Lake Road Rehabilitation

Posted on Friday, June 20, 2025 01:01 PM

NOTICE OF CONSTRUCTION

2025 Caledon Road Rehabilitation

The Town of Caledon’s Engineering Services Department will be undertaking rehabilitation work along Heart Lake Road from Beech Grove Sideroad to Charleston Sideroad. The scope of work includes base stabilization, new asphalt paving, and enhancements to local drainage systems.

R.J. Burnside & Associates Ltd. has been retained to provide consulting services for this project, and Pacific Paving has been awarded the construction contract.

Town Hall Building

Construction Notice: RFT 2025-060 Mountainview Road Rehabilitation

Posted on Friday, June 20, 2025 10:10 AM

NOTICE OF CONSTRUCTION 

Mountainview Road Rehabilitation, Caledon East

As part of RFT 2025-060, Mountainview Road Rehabilitation from Olde Base Line Road to Walker Road West will be limited to local traffic only the duration of the project. The road will be repaved, including paved shoulders in suitable areas, and roadside drainage improvements. A single lane will be open at all times for local traffic only.

Access for Emergency Services, Student Transportation Services, Waste Collection, and...

Town Hall Building

Construction Notice - RFT 2025 - 063 McLaren Road Rehab

Posted on Friday, June 20, 2025 08:52 AM

NOTICE OF CONSTRUCTION

2025 Caledon Road Rehabilitation

The Town of Caledon’s Engineering Services Department will be undertaking rehabilitation work along McLaren Road from 17901 McLaren Road to Charleston Sideroad. The scope of work includes base stabilization, new asphalt paving, and enhancements to local drainage systems.

R.J. Burnside & Associates Ltd. has been retained to provide consulting services for this project, and Pacific Paving has been awarded the construction contract.

Anticipated...