News and Notices
Search
Surface Treatment Program - Various Road Sections
Posted on Tuesday, August 16, 2022 04:13 PM
What are we doing?
- Surface treatment is a process that resurfaces a road with a hard surface with the finished product appearing similar to asphalt.
- The process may include removing the existing hard surface on the road, adding gravel and then proceeding with the surface treatment process. This process consists of spraying an asphalt emulsion on the road followed by spreading an aggregate over the emulsion and compacting the aggregate to press it into the emulsion. Some roads being treated will...
Notice of Commencement Active Transportation Master Plan
Posted on Tuesday, August 16, 2022 03:45 PM
The Town of Caledon is developing an Active Transportation Master Plan (ATMP). The ATMP will identify a well-connected and safe active transportation network and its implementation strategy. The ATMP will encourage residents and visitors to walk, bike, hike, and become more active as they live, work and play within the community.
Get Involved!
Public input is a key component of the Caledon Active Transportation Master Plan. As part of the project, the Town will be hosting several consultation and...

Town of Caledon breaks ground for new Baseball Diamonds in Bolton
Posted on Wednesday, August 10, 2022 05:21 PM
August 10, 2022 – Today, the Town of Caledon held a groundbreaking ceremony celebrating the new baseball diamonds that will be part of a new sports park located at the corner of Duffy’s Lane and Emil Kolb Parkway in Bolton.
Funded entirely through development charge revenue, the new sports park will feature two baseball diamonds with lighting, a parking lot and reserved space for a future washroom/change room building.
"Today is an exciting day for Caledon youth as we continue to add...
St. Andrews Road Culvert Replacement
Posted on Tuesday, August 09, 2022 11:38 AM
Project Name: Culvert #1204 Replacement
St. Andrews Road will undergo a road closure to complete the replacement of structure #1204. The last available emergency access available Northbound from Charleston Side Road is 19275 St Andrews Rd. The last available emergency access available southbound from Beech Grove Side Road is 19250 St Andrews Rd. The designated detour route is Beech Grove Side Rd Horseshoe Hill Rd, and Charleston Side Rd. Please see attached key plan.Contract No.: Emergency...
Emergency Culvert Lining – Centreville Creek Road
Posted on Tuesday, August 09, 2022 11:30 AM
What are we doing?
- Emergency Culvert Lining at Centreville Creek Road (175 meters North of Patterson Sideroad).
- Relining of a single culvert along Centreville Creek Road.
- The scope shall also include the installation of environmental protection measures, a temporary work platform for installation of the culvert liner, and restoration of disturbed areas to existing conditions or better.
- To improve public and road safety.
- To extend the service life of the culverts and prevent future excavation of...