Public Notices

Search

Select a Date Range

Crack Sealing of Various Roads

Posted on Tuesday, August 23, 2022 11:15 AM

What are we doing?

  • Crack sealing is a process using hot rubberized sealant to seal cracks in an asphalt surface.

  • The process includes routing existing cracks to “clean up” the edges of a crack and provide more control of the rubber compound as it penetrates into the crack.
  • Asphalt debris may be encountered as a result of this work, but it will migrate to the shoulders shortly after the work is complete.
Where?

The following roads will have crack sealing completed this year:

  • Shaw’s Creek Road –...

Surface Treatment Program - Various Road Sections

Posted on Tuesday, August 16, 2022 04:13 PM

What are we doing?

  • Surface treatment is a process that resurfaces a road with a hard surface with the finished product appearing similar to asphalt.
  • The process may include removing the existing hard surface on the road, adding gravel and then proceeding with the surface treatment process. This process consists of spraying an asphalt emulsion on the road followed by spreading an aggregate over the emulsion and compacting the aggregate to press it into the emulsion. Some roads being treated will...

Notice of Commencement Active Transportation Master Plan

Posted on Tuesday, August 16, 2022 03:45 PM

The Town of Caledon is developing an Active Transportation Master Plan (ATMP). The ATMP will identify a well-connected and safe active transportation network and its implementation strategy. The ATMP will encourage residents and visitors to walk, bike, hike, and become more active as they live, work and play within the community.

Get Involved!

Public input is a key component of the Caledon Active Transportation Master Plan. As part of the project, the Town will be hosting several consultation and...

St. Andrews Road Culvert Replacement

Posted on Tuesday, August 09, 2022 11:38 AM

Project Name: Culvert #1204 Replacement

St. Andrews Road will undergo a road closure to complete the replacement of structure #1204. The last available emergency access available Northbound from Charleston Side Road is 19275 St Andrews Rd. The last available emergency access available southbound from Beech Grove Side Road is 19250 St Andrews Rd. The designated detour route is Beech Grove Side Rd Horseshoe Hill Rd, and Charleston Side Rd. Please see attached key plan.

Contract No.: Emergency...

Emergency Culvert Lining – Centreville Creek Road

Posted on Tuesday, August 09, 2022 11:30 AM

What are we doing?

  • Emergency Culvert Lining at Centreville Creek Road (175 meters North of Patterson Sideroad).
  • Relining of a single culvert along Centreville Creek Road.
  • The scope shall also include the installation of environmental protection measures, a temporary work platform for installation of the culvert liner, and restoration of disturbed areas to existing conditions or better.
Why?
  • To improve public and road safety.
  • To extend the service life of the culverts and prevent future excavation of...