RSS IconRSS Print IconPrint Text Size Plus icon Minus icon

Major Projects

caledon.ca/majorprojects

The Town's Facilities division and Engineering Services are responsible for many construction and road rehabilitation projects. 

The Town's Facilities division plans, builds and maintains many of the Town's assets; such as community centres and fire stations. Facilities is responsible for ensuring effective land and building utilization within the community through planning, design, budgeting, scheduling, construction, operations and maintenance of town lands as well as facilities and ensuring that all development meets applicable codes and standards.

Engineering Services is responsible for managing the Town's Capital Projects, environmental assessments, technical review of development applications, construction inspection, and facilitation of subdivision assumption. The department also handles the design and construction of roads, bridges, culverts, and stormwater management.

Learn more about some of the Facilities and Engineering projects that are currently underway, along with recently completed work.

Mayfield West/Southfields CECC Expansion Humberview Artificial Track & Field
Bolton Fire Station    

 


Current Projects - Facilities

Mayfield West Phase 1 - Community Centre 

Construction Timeline of Community Centre

Construction for the new community centre in Southfields is underway and will continue into 2018. A groundbreaking ceremony took place on site in the fall of 2017.

The new 65,000 square foot community centre will be located on the southeast corner of Kennedy Road and Dougall Avenue, located opposite a retail plaza. Residents will be able to enjoy the variety of amenities in the building such as the town's first two-tank swimming pool, fitness centre and aerobics studio, multi-purpose space, youth and senior's dedicated rooms and community hub space for the library, OPP, EarlyON Centre and other hub partners.

A Groundbreaking Ceremony took place at the site of the recreation centre in September 2017, with some of our Councillors, Mayor Allan Thompson and special dignitaries all in attendance. Community members were able to hear about the vision for the new community centre in Southfields and connect personally with invited guests. You can see some photos of the event here: Southfields Ground Breaking.

Community Centre Rendering

(the rendering of the community centre is the artists interpretation of the building. The actual centre may look different than the rendering presented)

Frequently Asked Questions (FAQ)

How can my children get to/from school safely? What route should they take?

  • During construction, the sidewalk on the south side of Dougall Avenue (east of Kennedy) will be closed. School crossing guards will assist children to cross to the north side of Dougall Avenue
  • Approximately 30 minutes before and after school, crossing guards will be posted at:
    • the Kennedy/Dougall intersection - 1 crossing guard; and
    • the Learmont/Dougall intersection- 2 crossing guards.
  • This temporary closure will be clearly signed at both intersections to advise pedestrians to cross at the designated area and travel east to west on the north side of Dougall Ave. This temporary closure will remain during active construction.
  • View the closure map (PDF).

Is there another community space that residents can use while the community centre is being built?

  • The Town is finalizing temporary program space within the Southfields community. This will allow our recreation staff and the community hub partners an opportunity to deliver some programming in advance of the completion of new community centre. More information will be provided soon.

When can residents expect construction vehicles and equipment to be operational and making noise?

  • Construction will take place within the hours stated in the Town's Noise by-law (6 a.m. - 11 p.m.)

Contact

Sherry Brake, Project Manager
905-584-2272 x.4263
Sherry.Brake@caledon.ca


Current Projects - Facilities 

Caledon East Community Complex Expansion (CECC)

Proposed Progress Chart

The Town is in the process of designing the phase 3 expansion of the Caledon East Community Complex. An open house was held on June 7, 2018 to display information about the expansion project, answer any questions and discuss the next steps.

Open House Photo  Open House Photo 2  Open House Photo 3

(Open House Photos)

Proposed Preliminary Concepts

CECC Lower Level   CECC Upper Level

(Drawings are considered preliminary concepts only. Subject to change)

The amenities being considered at CECC are:

  • A new full service fitness centre
  • A warm viewing area to the arena
  • Accessible access to the existing viewing area of pad two
  • A multi-purpose gymnasium
  • An integrated walking track
  • An aerobics studio
  • A dedicated youth/seniors space
  • A dedicated sports hall of fame, and
  • Administrative space for staff and affiliate groups.

The above noted amenities listed are in accordance with recommendations made within the Facility Needs Assessment Study conducted in 2017.

Documents

Contact

Sherry Brake, Project Manager
905-584-2272 x.4263
Sherry.Brake@caledon.ca


Humberview Secondary School Artificial Track & Field

Humberview Secondary School will be home to a new artificial track and field facility in a joint project by Town of Caledon and Peel District School Board.

This project represents a total investment of $1.8M investment for which the Peel District School Board and the Town of Caledon are both contributing $900K. The facility will include artificial turf field, new walking/running track with a synthetic surface, LED lighting and fencing on the sports field.

This is a major improvement to the current sports field. Sports teams and clubs from Humberview Secondary School will benefit from this capital project for decades to come, along with community groups in the nearby area. 

Read the full release: Peel board partners with Town of Caledon

Humberview Track & Field

Read the Frequently Asked Questions (FAQs).

Contact 

Questions regarding Humberview Secondary School or Peel District School Board:
Michael Arruda, Project Manager
905-890-1010 x. 2088

Questions specifically for the Town of Caledon:
Robert Beatty, Specialist, Recreation
905-583-2272 x. 4005