The Town's Facilities division and Engineering Services are responsible for many construction and road rehabilitation projects. 

The Town's Facilities division plans, builds and maintains many of the Town's assets; such as community centres and fire stations. Facilities is responsible for ensuring effective land and building utilization within the community through planning, design, budgeting, scheduling, construction, operations and maintenance of town lands as well as facilities and ensuring that all development meets applicable codes and standards.

Engineering Services is responsible for managing the Town's Capital Projects, environmental assessments, technical review of development applications, construction inspection, and facilitation of subdivision assumption. The department also handles the design and construction of roads, bridges, culverts, and stormwater management.

Learn more about some of the Facilities and Engineering projects that are currently underway, along with recently completed work.

Fire Training Facility  CECC Expansion
 Southfields Community Centre  

 


Fire Training Facility

Construction of Phase 1 of the Caledon Fire and Emergency Services' new multidisciplinary training facility began July 1, 2019 with basic site preparation and pouring of the concrete foundation of the main fire training structure. The approved budget for Phase 1 is $1.3 million and is expected to be completed by December 2019. 

Fire Training Facility

(The rendering of the training facility is what was proposed in 2017)

Frequently Asked Questions (FAQ)

How will the training facility increase firefighter safety?

  • With properly designed and constructed to National Fire Protection Association and Ontario Building Code requirements, the new training facility and equipment will replace the existing “ad hoc” training at other municipalities’ training facilities.
  • We will be able to create standard and well-planned training modules in a dynamic, realistic and safe environment. This will provide our firefighters with the necessary training and development. 

How noisy will the training facility be?

  • Fire trucks will not use their sirens at the training facility.
  • Truck engines, small motor engines (e.g. pumps and chainsaws) would be used at the training facility, none of which create considerable noise pollution when used on their own.

How will the new facility does it affect me, my kids, and my property value?

  • The fire training facility is designed to blend in with the agricultural heritage of Caledon and will utilize current local planting, trees and bushes as an extension of the natural scenery.

Contact

Derek Mumford, Project Manager
905-584-2272 x. 4289
Derek.Mumford@caledon.ca


Southfields Community Centre

Construction Timeline of Community Centre

Construction for the new community centre in Southfields is underway and will continue into early 2020. 

The new 65,000 square foot community centre will be located on the southeast corner of Kennedy Road and Dougall Avenue, located opposite a retail plaza. Residents will be able to enjoy the variety of amenities in the building such as:

  • The town's first two-tank swimming pool
  • Fitness centre and aerobics studio
  • Multi-purpose space
  • Youth and senior's dedicated rooms
  • Community hub space for Bright Scholars Montessori Caledon, Caledon Public Library, OPP and EarlyON Centre and other hub partners

A Groundbreaking Ceremony took place at the site of the recreation centre in September 2017, with some of our Councillors, Mayor Allan Thompson and special dignitaries all in attendance. Community members were able to hear about the vision for the new community centre in Southfields and connect personally with invited guests. You can see some photos of the event here: Southfields Ground Breaking.

Community Centre Rendering

(the rendering of the community centre is the artists interpretation of the building. The actual centre may look different than the rendering presented)

Frequently Asked Questions (FAQ)

How can my children get to/from school safely? What route should they take?

  • During construction, the sidewalk on the south side of Dougall Avenue (east of Kennedy) will be closed. School crossing guards will assist children to cross to the north side of Dougall Avenue
  • Approximately 30 minutes before and after school, crossing guards will be posted at:
    • the Kennedy/Dougall intersection - 1 crossing guard; and
    • the Learmont/Dougall intersection- 2 crossing guards.
  • This temporary closure will be clearly signed at both intersections to advise pedestrians to cross at the designated area and travel east to west on the north side of Dougall Ave. This temporary closure will remain during active construction.
  • View the closure map (PDF).

Is there another community space that residents can use while the community centre is being built?

  • The Town is finalizing temporary program space within the Southfields community. This will allow our recreation staff and the community hub partners an opportunity to deliver some programming in advance of the completion of new community centre. More information will be provided soon.

When can residents expect construction vehicles and equipment to be operational and making noise?

  • Construction will take place within the hours stated in the Town's Noise by-law (6 a.m. - 11 p.m.)

Can I apply for a job at the community centre?

  • A job fair will take place in Southfields where you can learn more about the various positions available at the community centre. Learn more about the job fair.

Contact

Sherry Brake, Project Manager
905-584-2272 x.4263
Sherry.Brake@caledon.ca


Caledon East Community Complex Expansion (CECC)

Proposed Progress Chart

The Town is in the process of designing the phase 3 expansion of the Caledon East Community Complex. An open house was held on June 7, 2018 to display information about the expansion project, answer any questions and discuss the next steps.

Open House Photo  Open House Photo 2  Open House Photo 3

(Open House Photos)

Proposed Preliminary Concepts

CECC Lower Level   CECC Upper Level

(Drawings are considered preliminary concepts only. Subject to change)

The amenities being considered at CECC are:

  • A new full service fitness centre
  • A warm viewing area to the arena
  • Accessible access to the existing viewing area of pad two
  • A multi-purpose gymnasium
  • An integrated walking track
  • An aerobics studio
  • A dedicated youth/seniors space
  • A dedicated sports hall of fame, and
  • Administrative space for staff and affiliate groups.

The above noted amenities listed are in accordance with recommendations made within the Facility Needs Assessment Study conducted in 2017.

Documents

Contact

Sherry Brake, Project Manager
905-584-2272 x.4263