RSS IconRSS Print IconPrint Text Size Plus icon Minus icon

Alton Village Environmental Assessment

Posted on Friday August 09, 2019

Update (August 9, 2019)

The Display Boards that were available at the first PIC are attached for review. Also attached is a comment sheet which you can fill out and submit via email or regular mail. Submission details are in the comment sheet.

 

Update (July 23, 2019)

The first of two Public Information Centres (PIC) will be held to share information on existing conditions and general alternatives being considered, and to receive input from the public on the key issues and constraints within the study area. The PIC will be an informal “Open House” with materials on display and members of the project team on hand to  answer questions.

August 8, 2019 | 6 - 8 p.m.
Caledon Public Library, Alton Branch
35 Station Street
Caledon, ON L7K 0E2

See the full notice attached

 

First Notive (April 25, 2019)

The Town of Caledon has initiated an assessment for the reconstruction of Main Street North and Queen Street West (Alton Village) to increase connectivity and make the area more accessible to visitors.

The purpose of the study is to investigate a number of alternative solutions and develop a recommended road design that enhances connectivity and visitor accessibility to the Alton Village area. The study will consider technical, aesthetic, and structural requirements; as well as socio-economic, cultural heritage, and natural environment factors.

The full notice is attached.