A Comprehensive
Broader Scale Environmental Study (CBSES or the Study) for Caledon Aggregate
Resource Area 9-A, and functionally related lands, is being prepared to address
the policies of the Town of Caledon Official Plan. The Study is being completed by James Dick Construction Limited
(JDCL) who have applied for a quarry license on a property known as the
Rockfort Quarry lands, which is located within Caledon Aggregate resource Area
9-A (refer to the Study Area maps below).
The overall purpose of the Study is
three-fold:
* To develop a science-based understanding of
the natural environment within the resource area and “functionally connected”
lands
* To develop an understanding of how
the environment might respond to changing land uses (i.e. new quarries)
* To develop policies and management
strategies to prevent unacceptable environmental impacts and to guide
site-specific applications
The Study is
structured into three main parts:
•
Part A: Ecosystem Characterization
How the natural environment is functioning within
the study area
•
Part B: Sensitivity Analysis
Modeling potential environmental response/ impacts
in relation to land use change
Developing initial environmental management objectives and targets
•
Part C: Implementation
Comprehensive Adaptive Management Plan
Long Term Monitoring Plan
Site Specific study requirements
Policy conformity assessment
Other findings and recommendations
A revised draft Part A Report was issued in
November 2006. The draft Part B Report
was issued in June 2007 and the draft Part C Report was issued on October 30,
2007. In addition to the information
provided through this webpage, copies of these reports are available for review
at the Town of Caledon and CD copies can also be obtained by contacting the
Town of Caledon or the Coalition of Concerned Citizens. Additional information will be posted on
this webpage as it becomes available.
Background
Documents
CBSES
Agency Recommended Terms of Reference
CBSES
JDCL Detailed Work Plan January, 2007
Study
Area Map
Figure
1.2 Study Area
REPORTS
Part
A: Characterization Report (Draft
November 2006)
Due to the size of
the Part A Report, it is not posted on this website. The Report Table of Contents is provided below to provide an
outline of what is contained in the Report.
To order a CD copy of the report, please contact the Town of
Caledon at the contacts noted above.
Table
of Contents
Agency
Comments on Draft Part A Report
Part B: Sensitivity Analysis
Report (Draft June 2007)
Appendix
Figures
Tables
Text
Agency
Comments on Draft Part B Report
Part C: Implementation Report (Draft October 2007)
Volume
1 – 30OCT07
Agency
Comments on Draft Part C Report
PUBLIC CONSULTATION
In order to provide information to the public regarding the CBSES, and seek
public input, the Town of Caledon, Credit Valley Conservation, Region of Peel
and James Dick Construction Limited, have been jointly managing a public
consultation program, with input from the Coalition of Concerned Citizens. A Public Information Forum was held on
January 25, 2007 regarding the Draft Part A Report, and an “Objectives
Workshop” was held on February 27, 2007.
A third and final Forum will be held on January 22, 2008. The links below provide information
regarding these public consultation sessions.
January
25, 2007 Public Information Forum
Forum
Guide
Facilitator’s
Presentation
Agency
Presentation and Handout
JDCL
Consultant Presentation
JDCL
Consultant Handout
Feedback
Form & Registration Form for February 27, 2007 Workshop
Public
Comment Sheet
Forum
Summary Report
February
27, 2007 Public Information Forum
Forum
Guidebook
Forum
Summary Report
Excerpts from
Caledon Official Plan: Goals &
Objectives
· Section
2.2.3
· Section
3.1.2
· Section
5.11.1
January 22, 2008 Public Information Forum
CBSES
Update Newsletter & Forum Invitation
Public
Information Forum Notice
Agency
Presentation
JDCL
Presentation
Board
Order – Revised Schedule
March 8, 2008 Reports
Due to the size of Parts A, B & C Reports, it is not posted on this
website. The Report Table of Contents
is provided below to provide an outline of what is contained in the
Report. To order a CD copy of the
report, please contact the Town of Caledon at the contacts noted above.
Part A: Characterization – Volume
1: Report, Tables, Appendices (March
2008)
Part A: Characterization – Volume
2: Figures (March 2008)
Table
of Contents
Part B: Sensitivity Analysis – Volume
1: Report, Tables, Appendices (March
2008)
Part B: Sensitivity Analysis – Volume
2: Figures (March 2008)
Table
of Contents
Part C: Implementation – Volume 1: Report, Tables, Figures, Appendices (March
2008)
Table
of Contents
December 10, 2008 Public Information Meeting
Public
Information Meeting Notice
Rockfort
Quarry Public Information Meeting Minutes
Todd Salter’s Presentation – Attachment
“A” to Public Information Meeting Minutes
Mark Dorfman’s Presentation – Attachment
“B” to Public Information Meeting Minutes
James Dick Construction Presentation, presented by James Parkin – Attachment
“C” to Public Information Meeting Minutes
Coalition of Concerned Citizens Presentation, presented by Lillie Ann Morris – Attachment
“D” to Public Information Meeting Minutes
Caledon-Rockfort Peer Review Reports – November 21,
2008
Air
Quality
AMP
Barriers
Cultural
Heritage (Revised December 1, 2008)
CVC
Noise
Impact
Social
Impact
Traffic
Impact
Visual
Impact
Water Resources Impact
Rockfort
Quarry Report to Council – March 3, 2009
Due to the size of this Report with Schedules A
to D, the report and schedules can be found as one complete package or
separately:
Report CAO-2009-001 with schedules
Report
CAO-2009-001
Schedule A to CAO-2009-001
Schedule B to CAO-2009-001
Schedule C to CAO-2009-001
Schedule D to CAO-2009-001
Region
of Peel’s General Committee Report -Rockfort Quarry Application – April 2,
2009
Region of Peel website
Ontario
Municipal Board - Rockfort Quarry Hearing Public Session - April 12, 2010
The Ontario Municipal Board (OMB) has denied the appeals
filed by James Dick Construction Limited in the Rockfort Quarry case
Town
of Caledon Media Release
OMB
Decision