Policy Section

Rockfort Quarry/CBSES (Comprehensive Broader Scale Environmental Study) Caledon Aggregate Resource Area 9-A

Haiqing Xu, Manager of Policy
(905) 584-2272 x4172
Monday to Friday, 8:30 am to 4:30 pm

Note:  Some of the documents below are fairly large and may be slow or difficult for dial-up users to upload.  Hard copies of this material may be obtained by contacting the Town of Caledon at the contacts noted above.

Introduction

A Comprehensive Broader Scale Environmental Study (CBSES or the Study) for Caledon Aggregate Resource Area 9-A, and functionally related lands, is being prepared to address the policies of the Town of Caledon Official Plan.  The Study is being completed by James Dick Construction Limited (JDCL) who have applied for a quarry license on a property known as the Rockfort Quarry lands, which is located within Caledon Aggregate resource Area 9-A (refer to the Study Area maps below).

The overall purpose of the Study is three-fold:

*    To develop a science-based understanding of the natural environment within the resource area and “functionally connected” lands
*    To develop an understanding of how the environment might respond to changing land uses (i.e. new quarries)
*    To develop policies and management strategies to prevent unacceptable environmental impacts and to guide site-specific applications

The Study is structured into three main parts:

          Part A: Ecosystem Characterization
How the natural environment is functioning within the study area

          Part B:  Sensitivity Analysis
Modeling potential environmental response/ impacts in relation to land use change
Developing initial environmental management objectives and targets

          Part C: Implementation
Comprehensive Adaptive Management Plan
Long Term Monitoring Plan
Site Specific study requirements
Policy conformity assessment
Other findings and recommendations

A revised draft Part A Report was issued in November 2006.  The draft Part B Report was issued in June 2007 and the draft Part C Report was issued on October 30, 2007.  In addition to the information provided through this webpage, copies of these reports are available for review at the Town of Caledon and CD copies can also be obtained by contacting the Town of Caledon or the Coalition of Concerned Citizens.  Additional information will be posted on this webpage as it becomes available.

Background Documents

CBSES Agency Recommended Terms of Reference
CBSES JDCL Detailed Work Plan January, 2007

Study Area Map
Figure 1.2 Study Area

REPORTS

Part A:  Characterization Report (Draft November 2006)

Due to the size of the Part A Report, it is not posted on this website.  The Report Table of Contents is provided below to provide an outline of what is contained in the Report.  To order a CD copy of the report, please contact the Town of Caledon at the contacts noted above.
Table of Contents
Agency Comments on Draft Part A Report

Part B:  Sensitivity Analysis Report (Draft June 2007)

Appendix
Figures
Tables
Text
Agency Comments on Draft Part B Report

Part C:  Implementation Report (Draft October 2007)

Volume 1 – 30OCT07
Agency Comments on Draft Part C Report

PUBLIC CONSULTATION
In order to provide information to the public regarding the CBSES, and seek public input, the Town of Caledon, Credit Valley Conservation, Region of Peel and James Dick Construction Limited, have been jointly managing a public consultation program, with input from the Coalition of Concerned Citizens.  A Public Information Forum was held on January 25, 2007 regarding the Draft Part A Report, and an “Objectives Workshop” was held on February 27, 2007.  A third and final Forum will be held on January 22, 2008.  The links below provide information regarding these public consultation sessions.

January 25, 2007 Public Information Forum

Forum Guide
Facilitator’s Presentation
Agency Presentation and Handout
JDCL Consultant Presentation
JDCL Consultant Handout
Feedback Form & Registration Form for February 27, 2007 Workshop
Public Comment Sheet
Forum Summary Report

February 27, 2007 Public Information Forum
Forum Guidebook
Forum Summary Report

Excerpts from Caledon Official Plan:  Goals & Objectives
·     Section 2.2.3
·     Section 3.1.2
·     Section 5.11.1

January 22, 2008 Public Information Forum
CBSES Update Newsletter & Forum Invitation
Public Information Forum Notice
Agency Presentation
JDCL Presentation

Board Order – Revised Schedule

March 8, 2008 Reports
Due to the size of Parts A, B & C Reports, it is not posted on this website.  The Report Table of Contents is provided below to provide an outline of what is contained in the Report.  To order a CD copy of the report, please contact the Town of Caledon at the contacts noted above.
Part A:  Characterization – Volume 1:  Report, Tables, Appendices (March 2008)
Part A:  Characterization – Volume 2:  Figures (March 2008)
Table of Contents
Part B:  Sensitivity Analysis – Volume 1:  Report, Tables, Appendices (March 2008)
Part B:  Sensitivity Analysis – Volume 2:  Figures (March 2008)
Table of Contents
Part C:  Implementation – Volume 1:  Report, Tables, Figures, Appendices (March 2008)
Table of Contents

December 10, 2008 Public Information Meeting
Public Information Meeting Notice
Rockfort Quarry Public Information Meeting Minutes
Todd Salter’s Presentation – Attachment “A” to Public Information Meeting Minutes
Mark Dorfman’s Presentation – Attachment “B” to Public Information Meeting Minutes
James Dick Construction Presentation, presented by James Parkin – Attachment “C” to Public Information Meeting Minutes
Coalition of Concerned Citizens Presentation, presented by Lillie Ann Morris – Attachment “D” to Public Information Meeting Minutes

Caledon-Rockfort Peer Review Reports – November 21, 2008
Air Quality
AMP Barriers
Cultural Heritage (Revised December 1, 2008)
CVC
Noise Impact
Social Impact
Traffic Impact
Visual Impact
Water Resources Impact

Rockfort Quarry Report to Council – March 3, 2009
Due to the size of this Report with Schedules A to D, the report and schedules can be found as one complete package or separately:
Report CAO-2009-001 with schedules
Report CAO-2009-001
Schedule A to CAO-2009-001
Schedule B to CAO-2009-001
Schedule C to CAO-2009-001
Schedule D to CAO-2009-001

Region of Peel’s General Committee Report -Rockfort Quarry Application – April 2, 2009

Region of Peel website

Ontario Municipal Board - Rockfort Quarry Hearing Public Session - April 12, 2010

The Ontario Municipal Board (OMB) has denied the appeals filed by James Dick Construction Limited in the Rockfort Quarry case
Town of Caledon Media Release
OMB Decision



 

Contact the Town of Caledon