Mayfield West Phase 2 Secondary Plan
Tim Manley, Senior Policy Planner
(905) 584-2272 x.4285
Monday to Friday, 8:30 am to 4:30 pm

 

Please click on the links below to access the presentation materials which were on display at the May 10, 2012 Public Open House at the Brampton Fairgrounds.

Presentation Materials Open House

 

Most Recent News - On August 10, 2010 Town Council endorsed the preferred scenario for Mayfield West through Report PD-2010-050.  The preferred scenario identifies the preferred location for the next phase of growth for Mayfield West and illustrates the land uses intended for that location.  A link to PD-2010-050 is provided below.

PD-2010-050 Mayfield West Phase 2 Secondary Plan Preferred Scenario

Mayfield West:  Located in the southwest part of the Town of Caledon, the Rural Service Centre of Mayfield West is being planned by the Town as a compact, vibrant, well integrated community through a series of phased settlement boundary expansions.  The first such expansion occurred through the Mayfield West Community Development Plan (Official Plan Amendment No. 208) which was endorsed by Town Council on July 4, 2006 and approved by the Ontario Municipal Board on October 1, 2007.

Population and Employment Forecasts:  The Townhas revised the population forecast for Mayfield West for 2021 from 13,100 to 17,000 (the population increase of 3,900 has been reallocated from elsewhere in the Town) and allocated a further 9,838 population to Mayfield West for the planning period 2021 to 2031.

Mayfield West Phase 2 Secondary Plan (MW2):  In 2008, the Town initiated MW2 to determine, among other things, the appropriate location in Mayfield West for the population growth outlined above.  On June 10, 2008, Town Council approved general terms of reference for MW2 which, among other things, provide details about what the planning exercise will achieve, the time it will take do be completed and how and when the public can provide input.

In addition to planning for the population growth outlined above, MW2 is also planning for new employment lands to accommodate approximately 5,895 new jobs, approximately 935,000 sq. ft. of commercial uses, and new community parks, schools, public open spaces and a twin-pad ice arena to support and complement the population growth.  Implementing these planning considerations will require an expansion to the existing 2021 Mayfield West settlement boundary.

In keeping with the Town of Caledon Official Plan, settlement boundary expansions in Mayfield West will occur within the Mayfield West Community Development Plan Study Area, a study area which is established in the Town’s Official Plan on Schedule B – Mayfield West Land Use Plan.  A link to the general terms of reference is provided below.

MW2 General Terms of Reference
Schedule A - Town of Caledon Schedule B Mayfield West Land Use Plan
Schedule B - Work Program and Schedule

In April 2009, Town Council approved revisions to key milestone events in the MW2 work program and schedule.  A link to Report PD-2009-021 and the revised work program and schedule is provided below.

PD-2009-021: Mayfield West Phase 2 Secondary Plan: Project Update & Proposed Revisions to the Work Program
Revised Work Program and Schedule

Technical Consultant Team:  The Town has retained a team of technical consultants to complete the necessary technical studies to complete MW2 and to support a proposed settlement boundary expansion.  The technical studies include:

Population and Employment Forecasts and Allocations Study, 2006 (Town of Caledon, Watson & Associates Economists Ltd, The Butler Group Consultants Inc.) - completed as part of the South Albion-Bolton Community Plan;
The Employment Land Needs Study, 2007:  Watson & Associates Economists;
Comprehensive Environmental Impact Study and Management Plan:  consulting firms include Amec Earth and Environmental and Dougan & Associates;
Agricultural Impact Assessment: Colville Consulting Inc;
Water and Wastewater Servicing Study:  R.J. Burnside & Associates;
Cultural Heritage Landscapes Assessment and Built Heritage Resources Assessment: Andre Scheinman & ENVision-The Hough Group;
Stage 1 Archaeological Study:  Historic Horizon;
Transportation Impact Study: 
Paradigm Transportation Solutions Limited;
Noise and Vibration Impact Assessment:  Jade Acoustics; and
Commercial Needs Assessment:  W. Scott Morgan.

Sustainable Community Planning:  The Town has also retained Urban Strategies Inc. (USI) to be the Town’s community design and sustainability consultant.

The Provincial Growth Plan:  With the introduction of the Growth Plan, the Province has engaged new thinking in respect of the way growth occurs in the Greater Golden Horseshoe area and the Regions within it, including the Region of Peel.  Part of this new thinking is an emphasis of developing greenfield communities which are compact, integrated and more sustainable.

One of the key objectives of the Growth Plan is to minimize urban sprawl and promote cost-effective development.  This has led to an increased emphasis on achieving higher densities for both population and employment to reduce land consumption and to promote greater use of existing infrastructure.  Under the Growth Plan, new development taking place in designated greenfield areas must be planned and designed in a manner that contributes to creating complete communities.  The Growth Plan defines complete communities as:

“Complete communities meet people’s needs for daily living throughout an entire lifetime by providing convenient access to an appropriate mix of jobs, local services, a full range of housing, and community infrastructure including affordable housing, schools, recreation and open space for their residents.  Convenient access to public transportation and options for safe, non-motorized travel is also provided.”

Guiding Principles:  In May 2009, Town Council endorsed nine guiding principles for MW2 through Report PD-2009-029.  The nine guiding principles are:

1.     Achievenet ecological gain, when practical, possible and advisable.
2.     Adopt an integrated design process.
3.     Foster a local identity rooted in the spirit of the Town of Caledon.
4.     Establish the structure for a close knit small town that fosters self sufficiency.
5.     Achieve a range and mix of housing.
6.     Promote walking, cycling and transit opportunities.
7.     Maximize conservation and innovation (water, waste, energy).
8.     Ensure community connectivity and integration at all scales.
9.     Support adaptive change.

The principles provide the basis for defining and confirming the overall direction for MW2, reflecting the collective interests, aspirations and desires of a broad range and mix of interests including agencies, advisory committees of Town Council, stakeholders, landowners and residents.  Given this encompassing mandate, the principles are broad in nature.  They have “set the bar high”, challenging all parties to push the boundaries of their own experience, reconsider other’s points of view, and collectively define a plan for MW2 that is as good as it can possibly be.  A link to PD-2009-029 is provided below.

PD-2009-029: Mayfield West Phase Two Secondary Plan: Recommended Principles

Working towards a Preferred Scenario:  The MW2 work program is comprised of four distinct phases.  Phase 1 of the work program included a comprehensive characterization of the study area.  A public participation process was initiated and included a Council Workshop held on December 3, 2008 and a Public Open House held on December 11, 2008 to review the findings of the Phase 1 technical studies.  Links to the information presented at the Council Workshop are provided below.

Planning & Development Department.
Comprehensive Environmental Impact Study and Adaptive Management Plan.
Water & Wastewater Servicing Study.
Transportation Impact Study.
Agricultural Impact Assessment.
Noise & Vibration Impact Assessment.
Cultural Heritage Landscapes & Built Heritage Resources Assessment.

June 2009 Alternative Scenarios:  In Phase 2 of the work program, USI, in collaboration with the Town’s technical consulting team, used the information contained in the Phase 1 technical studies to prepare three alternative scenarios.  Each of the scenarios represented a distinct ‘high level’ idea about where the next phase of growth could be in Mayfield West and how it would relate to existing and planned growth, the natural heritage system and existing and planned infrastructure.

The three alternative scenarios were presented at a Council Workshop held on June 22, 2009 and a Public Open House held on June 25, 2009, at which time landowners, key stakeholders, and other members of the public were invited to provide comments on the alternative scenarios.  Links to the June 22 Council Workshop presentation, June 25 Public Open House presentation and the June 2009 alternative scenarios are provided below.

June 22 Council Workshop Presentation
June 25 Public Open House Presentation
June 2009 Alternative Scenarios

Links to the presentation panels on display at the June 25 Public Open House are provided below.

Community Design & Sustainability
Comprehensive Environmental Impact Study & Adaptive Management Plan
Water & Wastewater Servicing
Transportation Impact Study
Agricultural Impact Assessment
Noise & Vibration Impact Assessment
Cultural Heritage Landscapes & Built Heritage Resources Assessment

February 2010 Preferred Scenario: All input received on the three alternative scenarios was considered by USI in the preparation of a draft preferred scenario.  The draft preferred scenario was presented at a Council Workshop held on February 16, 2010 and a Public Open House held on February 25, 2010, at which time landowners, key stakeholders, and other members of the public were invited to provide comments on the draft preferred scenario.  Links to the February 16 Council Workshop presentation, February 25 Public Open House presentation and the February 2010 draft preferred scenario are provided below.

February 16 Council Workshop Presentation
February 25 Public Open House Presentation
February 2010 Draft Preferred Scenario

June 2010 Preferred Scenario (1st revision): All input received on the February 2010 draft preferred scenario was considered by USI in the preparation of a draft preferred scenario (1st revision).  The draft preferred scenario (1st revision) was presented at a Council Workshop held on June 15, 2010.  Links to the June 15 Council Workshop presentation and the June 2010 draft preferred scenario (1st revision) are provided below.

June 15 Council Workshop Presentation
June 2010 Draft Preferred Scenario (1st revision)

Further to the discussion at the June 15 Council Workshop a link is provided below to the June 8, 2010 Council delegations by Caledon’s Seniors Advisory Committee and Caledon’s Accessibility Advisory Committee.

Caledon Seniors Advisory Committee
Caledon Accessibility Advisory Committee

August 10, 2010 Preferred Scenario: All input received on the June 2010 draft preferred scenario (1st revision) was considered by USI in the preparation of a recommended preferred scenario.  On August 10, 2010 Town Council endorsed the preferred scenario for MW2 through Report PD-2010-050.  A link to PD-2010-050 is provided below.

PD-2010-050 Mayfield West Phase 2 Secondary Plan: Preferred Scenario

The preferred scenario identifies the preferred location for the next phase of growth for Mayfield West and illustrates the land uses intended for that location.  During the detailed design phase (i.e. Phase 3 of the MW2 work plan) there will be an opportunity for refinements to the land uses intended for a location within the preferred scenario however, any refinements must respect the land budget and density targets described within Report PD-2010-050.

The preferred scenario represents a comprehensive plan, incorporating all the planning considerations in a compact, transit-supportive form.  Relevant and applicable Provincial, Regional and Town policy has been addressed in a responsible and appropriate manner.

The preferred scenario responds in a balanced manner to the findings and recommendations of the technical studies as well as Council, agency, stakeholder, landowner and resident input.  Lastly, it provides also an appropriate basis for the detailed planning and design of the community, as well as for the preparation of a secondary plan and local Official Plan Amendment.

Key Elements of the August 2010 Preferred Scenario

The preferred scenario includes approximately 350 hectares of land within an expanded settlement boundary, generally broken down as follows:

Residential Lands: A total of 183 hectares of new residential lands are proposed on lands west of Highway 10 which will accommodate 11,638 new residents and complementary new schools and community parks, and achieve an average overall density of 64 residents per hectare.

Employment Lands: A total of 92 hectares of new employment lands are proposed which will accommodate approximately 5,895 new jobs.  Seventy-six hectares of new employment lands are generally located east of Highway 10; it is intended that these lands would develop as prestige industrial uses, resulting in an average density of approximately 24 jobs per hectare.  Sixteen hectares of new employment lands are generally located west of Highway 410/10; it is intended that these lands would develop as prestige business/office park uses, resulting in an average density of approximately 70 jobs per hectare.

Commercial Lands:  A total of 35 hectares of new commercial lands are proposed to accommodate approximately 935,000 sq. ft. of commercial uses.

Transit Hub/Centre:  A transit hub/centre is proposed at the core of the prestige business/office park and commercial centre area, allowing for the provision of an effective interface between higher order transit along the Hurontario Street corridor (as envisioned in the Metrolinx Regional Transit Plan) and future potential local transit service.

Natural Heritage System:  A minimum of 43 hectares of lands associated with the protection and enhancement of the natural heritage system are proposed.  These lands include the three existing woodlots, identified headwater features and associated buffers and green linkages, located on lands west of Highway 10, and a green linkage connecting the existing woodlot and the Humber River tributary on lands east of Highway 10, between Heart Lake Road and Dixie Road.

2021 Planning Horizon:  Under the preferred scenario, 3,900 population has been allocated to the residential lands located west of Highway 10.

2021–2031 Planning Horizon: Under the preferred scenario, 2,100 population has been allocated to the existing residential land area within MW1, located east of Highway 10, and 7,738 population has been allocated to the residential land area proposed west of Highway 10.

Greenfield Density Targets: Under the preferred scenario, the density within the residential land area within MW1 has been increased from 41 residents and jobs combined per hectare to 50 residents and jobs combined per hectare.  The preferred scenario includes approximately 350 hectares of land within an expanded settlement boundary.  This area will accommodate 17,533 new residents and jobs, therefore achieving 50 residents and jobs combined per hectare.

Public Input:  Opportunities for public input on MW2 include Open Houses and Council Meetings.  Members of the public are encouraged to attend Council Workshops, however, they cannot participate in the discussion.  Information about opportunities for public input will be advertised in local newspapers and also posted on this webpage.

Contacts:  If you would like more information, have questions or want to provide input on any aspect of MW2 please contact Tim Manley at Town Hall.



 